Heath-consultants GT Series Manual de usuario Pagina 29

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 170
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 28
3-7
OPERATING PROCEDURE
To switch OFF:
Press and hold NO . The screen, shown in
Fig. 3.9, is displayed.
Fig. 3.9 Switch OFF
Press and hold both the LH button and the RH
button
simultaneously to proceed with the
switch-off sequence.
4. Cal Due Date message is displayed with user
acknowledge for extended period option, if
overdue.
Calibration Due Date message is displayed, as
shown in Fig. 3.10.
Fig. 3.10 Calibration Due Date
Vista de pagina 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 169 170

Comentarios a estos manuales

Sin comentarios