Heath-consultants GT Series Manual de usuario Pagina 38

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 170
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 37
3-16
USER HANDBOOK
The screen, shown in Fig. 3.24, is displayed when
the Service date has expired. i.e. overdue.
Fig. 3.24 Switch OFF
To proceed with the switch-off sequence:
Press and hold both the LH button and the RH
button simultaneously.
Warm-up Complete
The instrument will now automatically select the Leak
Test Mode, as default.
The following configurable options are available:
a) To start up in specific operational mode.
b ) To start up in the mode last used.
Vista de pagina 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 ... 169 170

Comentarios a estos manuales

Sin comentarios